The US 5G altimeter fix moves interference risk onto receivers, and foreign airlines pay unaided
The FCC's draft rebate schedule for radio altimeter retrofits reached the Federal Register on 19 October. Foreign-registered aircraft must meet the same FAA deadlines with no rebate, and Asia-Pacific regulators are applying different separation margins.

The finding
The United States has priced the fix for 5G interference into aircraft radio altimeters, and foreign airlines are paying their share without help. On 19 October the Federal Communications Commission’s draft rebate schedule for altimeter retrofits reached the Federal Register, with initial comments due on 26 October [1][2]. Eligibility is limited to aircraft subject to FAA retrofit deadlines that operate in contiguous US airspace. Foreign-registered owners and operators are excluded [1]. The FAA’s own cost tables put the unrebated foreign bill close to US$1 billion or more [4].
This is a spectrum-security problem, not a paperwork one. A radio altimeter is a low-power receiver in 4.2–4.4 GHz [1]. It supports low-visibility landings and feeds terrain and collision warning systems. Regulators are designing against degraded performance near the ground [3][4][5]. The US answer is to harden the receiver fleet rather than permanently constrain the transmitters next door.
What the documents say
The FCC adopted its Upper C-band Report and Order (FCC 26-46) on 22 July 2026 [5][7]. It opens 3.98–4.14 GHz for terrestrial wireless, designates a 20 MHz guard band at 4.14–4.16 GHz, and keeps 4.16–4.2 GHz for satellite service [3][7]. Base station antennas are capped at 450 feet above ground [6]. Out-of-band emissions into the altimeter band are limited to −28.4 dBm/MHz EIRP or −46 dBm/MHz conducted, and the same limit now applies to Lower C-band licensees [3][6]. Auction 115 is tentatively scheduled to begin on 27 April 2027 [9]. New service can start on 31 December 2030 in the top 75 market areas, with remaining areas cleared by 30 June 2031 [8][10].
The FAA’s final rule took effect on 29 September 2026 [3]. Part 121 aircraft, and Part 129 foreign aircraft with 30 or more seats or more than 7,500 lb payload, must carry interference-tolerant altimeters by 30 December 2030. That is one day before new wireless service may begin. Other altimeter-equipped aircraft, including the rest of Part 129, follow by 31 October 2034 [3]. Tolerance is defined by an interference mask at or below 500 ft above ground. The FAA declined to add requirements above 500 ft [3]. The industry performance standard from RTCA SC-239 and EUROCAE WG-119 is scheduled for March 2027. It is not mandated by the rule [3].
The money flows one way. New licensees fund fixed rebates through a clearinghouse. Amounts are set by aircraft type, altimeters per aircraft and retrofit complexity [1]. The FCC rejected reimbursement of actual costs [1]. It stated that rebates for foreign-registered operators would not be in the public interest [1].
“The Commission also determined that it would not be in the public interest to offer rebates to foreign-registered aircraft operators and owners.” — FCC Wireless Telecommunications Bureau, DA 26-1076, Federal Register, 19 October 2026 [1]
Where the figures differ
The FCC estimates total rebates at US$3.83–5.71 billion, according to a law-firm summary of the Order [8]. The FAA’s analysis gives rebate transfers to domestic operators of US$3,833–5,648 million in 2025 dollars [4]. The low ends match. The high ends differ by about US$60 million. We publish both.
The FAA tables cost foreign obligations by row. Part 129 aircraft over 30 seats: US$891–1,336 million. Part 129 under 30 seats: US$71–106 million. Foreign Part 91: US$26–39 million [4]. On the desk’s arithmetic those rows total roughly US$0.99–1.48 billion. IATA’s challenge cites an FAA estimate of about US$1 billion [11]. That matches the low end. It does not reflect the upper bound. Per-unit costs are modelled at US$80,000–120,000 per airplane altimeter installed, and US$40,000 for rotorcraft [4]. A figure of about 58,000 units circulates in reporting [11]. We could not trace it to an FAA table we read, so treat it as unverified.
One administrative point needs care. The FCC notice gives 26 October for comments and 16 November for replies in its Dates section. The Federal Register page metadata lists 16 November as the comment close [1]. Anyone filing should work to 26 October.
What it means
First, the burden lands on foreign operators. The FAA states plainly that foreign operators bear the full replacement cost [4]. It suggests some may limit cost by re-equipping only aircraft designated for US operations [4]. IATA has asked the D.C. Circuit to vacate the Order and make foreign airlines eligible. Its counsel called the exclusion a “discriminatory cost burden on foreign air carriers” [11]. The FCC’s stated rationale is the “fluid and itinerant nature” of foreign-registered carriers, as quoted in the report [11].
Second, the problem is not settled outside the US. In April EASA reported erroneous altimeter readings on Embraer E-Jets and ERJ-145s with specific Honeywell units. These occurred more often than fleet size would predict [12]. EASA recommended filter modifications and said there is no evidence confirming a direct link to 5G [12]. It did not issue an Airworthiness Directive [12].
Third, Asia-Pacific regulators have chosen different margins. The FCC will hold 60 MHz between new wireless and the altimeter band once retrofits are complete [7]. A 2024 ICAO regional paper records Japan using 5G up to 4.1 GHz and avoiding 4.0–4.1 GHz near approach paths [13]. Australia’s interim restrictions on deployments above 3.7 GHz near CASA-identified runways and approaches ran to 31 March 2026. ACMA’s arrangements plan a 200 MHz separation [15]. A joint submission from Australian airports, pilots and Boeing Australia argued against relying on voluntary limits before tolerant altimeters exist [14].
“Spurious emission controls must remain enforceable, not voluntary.” — Joint submission to ACMA by Australian Airports Association, Australian Airline Pilots’ Association and others, 2026 [14]
What to do
- Airlines with US services: inventory altimeter part numbers by tail. Map aircraft against the 2030 and 2034 deadlines that apply to your Part 129 category [3][4].
- Model a US-designated sub-fleet against full-fleet retrofit, as the FAA’s analysis anticipates [4]. Track the IATA petition, which could change eligibility [11].
- Plan certification against the FAA mask now, not the RTCA/EUROCAE standard due in March 2027 [3].
- E-Jet and ERJ operators: review the Embraer filter service bulletins EASA references [12].
- Regional regulators and airports: assess aggregate RF exposure along approach paths, not single-site emissions. Keep a channel for reporting suspected interference [14][13].
- Safety teams: log erroneous altimeter readings as a distinct occurrence type. EASA’s signal came from occurrence frequency, not a single event [12].
The ELINT read
Interference management is usually treated as a transmitter problem. The US C-band settlement shifts it onto receivers. It does so on a fixed timetable, with a fixed price list, and with a defined group left out of the subsidy [1][3][4]. For Asia-Pacific carriers the practical exposure is to US rules, not home rules. Their regulators have kept wider separations or temporary site controls [13][15]. The open technical questions are the ones regulators did not close. These are performance above 500 ft, aggregate emissions near approaches, and filtered units with known susceptibility [3][12][14]. Operators should assume the spectrum will keep moving towards 4.2 GHz and size receiver resilience accordingly.
Sources
Every R3KONX article cites its primary material. 15 sources, in order of first citation. Links open the original publication.
- Wireless Telecommunications Bureau Seeks Comment on Proposed Rebate Categories and Amounts for Radio Altimeter Retrofits To Support the Upper C-band Transition (DA 26-1076) Federal Communications Commission / Federal Register · 2026-10-19
- FCC Proposes Rebates for Radio Altimeter Upgrades AVweb · 2026-10-19
- Requirements for Interference-Tolerant Radio Altimeter Systems (final rule) Federal Aviation Administration / Federal Register · 2026-07-31
- Requirements for Interference-Tolerant Radio Altimeter Systems, final rule (signed document incl. regulatory impact tables) Federal Aviation Administration · 2026-07-24
- FAA Statement on 5G Federal Aviation Administration · 2026-07-22
- Upper C-Band (3.98-4.2 GHz); Expanding Flexible Use of the 3.7 to 4.2 GHz Band (Report and Order) Federal Communications Commission / Federal Register · 2026-07-31
- Report and Order, FCC 26-46 (Upper C-band) Federal Communications Commission · 2026-07-22
- FCC Adopts Order to Initiate Upper C-Band Auction and Transition Process Davis Wright Tremaine (Broadband Advisor) · 2026-07-30
- Auction of Flexible-Use Licenses in the Upper C-Band for Next-Generation Wireless Services Scheduled for April 27, 2027; Comment Sought on Competitive Bidding Procedures for Auction 115 Federal Communications Commission / Federal Register · 2026-08-03
- Information Collection: Upper C-band Clearinghouse and Relocation Coordinator Real-Time Disclosure of Communications (FR Doc. 2026-21323) Federal Communications Commission / Federal Register · 2026-10-19
- International Airlines Seek Rebates for Gear Upgrades Tied to FCC Auction Rules Broadband Breakfast · 2026-09-02
- Safety Information Bulletin 2026-03: Radio Altimeter Susceptibility to 5G Interference (Embraer EMB-135/145, ERJ 170/190) European Union Aviation Safety Agency · 2026-04-14
- CNS SG/28 WP/13: Guidance Material on 5G and Radio Altimeter Issue ICAO Asia and Pacific Office (APANPIRG CNS Sub-group) · 2024-07-01
- Joint submission to ACMA: Additional assurance measures for the coexistence of wireless broadband services and radio altimeters Australian Airports Association, Australian Airline Pilots' Association et al. (via AIPA) · 2026-02-12
- Wireless broadband and radio altimeter coexistence: interim mitigations Australian Communications and Media Authority · 2026-10-19
Researched and written by the R3KONX analysis desk from the cited primary material. Methodological caveat: the FCC's draft rebate amounts sit in an appendix to DA 26-1076 that could not be retrieved, and the foreign-operator cost range is the desk's sum of FAA regulatory-impact table rows, not a figure the FAA states. Corrections to event@r3konx.asia.